Information
Key Notes
- Journal(s): 14
- Conference(s): 12
- Book Chapter(s): 9
- Text Book(s): 1
- PhD: Current - 4 Awarded - 1
- Event(s) Organized: Conference - 1 Workshop - 1 FDP - 1
36
PUBLICATIONS5
DOCTORAL STUDENTS4
PROJECTS2
PATENTSResearch Areas
Augmented Reality
BIM enabled Facility Management
Digital Twin for underground utilities
Lean Construction
nD Planning
Project Complexity
Underground utility information management
EDUCATION QUALIFICATION
| Degree | Institute | Year |
|---|---|---|
| Doctor of Philosophy | Indian Institute of Technology Madras | 2016 |
| Master of Technology | College of Engineering Guindy, Anna University Chennai | 2007 |
| Bachelor of Technology | Periyar Maniammai College of Tech for Women, Tanjore | 2001 |
COURSES HANDLED
| Course | L-T-P | Credit | Degree Level |
|---|---|---|---|
| Lean Construction(CE16003) | 3-0-0 | 3 | UG, PG |
| Quality and Safety Management(CE16026) | 3-0-0 | 3 | UG, PG |
| Contract Management and Arbitrations(CE16002) | 3-0-0 | 3 | UG, PG |
| Lean Construction(CE5112) | 3-0-0 | 3 | UG, PG |
| Quality and Safety Management(CE5163) | 3-0-0 | 3 | UG, PG |
| Construction Planning and Management(CE5102) | 3-0-0 | 3 | PG |
| Construction Techniques(CE5101) | 3-0-0 | 3 | UG, PG |
| Contract Management and Arbitration(CE5151) | 3-0-0 | 3 | UG, PG |
| Quantitative Methods in Construction Management(CE5152) | 3-0-0 | 3 | PG |
| Energy Efficient Buildings(CE5161) | 3-0-0 | 3 | PG |
| Construction Methods and Equipment(CE5153) | 3-0-0 | 3 | UG, PG |
PUBLICATIONS
Journal(s)
Development of Building Information Model–Enabled Facility Management for Metro Rail Stations,
By Ahmad Alothman, Aneetha Vilventhan,
ASCE,
Journal of Construction Engineering and Management,
vol.151,
pp.05024018,
2025
Impact of Project Complexity on Metrorail Performance Using Machine Learning,
By Dara Sruthilaya and Aneetha Vilventhan,
Taylor and Francis,
International Journal of Construction Management,
vol.,
pp.,
2025
Integration of Natural Language Processing (NLP) and Project Scheduling Tool for contractual delay risk identification in highway construction project using Large Language Models (LLMs),
By Gaureeshwar Manda and Aneetha Vilventhan,
ASCE,
Journal of legal affairs and dispute resolution in construction, ASCE,
vol.,
pp.,
2025
Predictive Maintenance of Metro Rail Station Facilities Using Tree-Based Machine-Learning Algorithms,
By Ahmad Alothman and Aneetha Vilventhan,
ASCE,
Journal of Performance of Constructed Facilities, ASCE,
vol.40,
pp.04025074,
2025
Identification of Dispute Causes and Analysis of Resolution Mechanisms in Metro Rail Projects Using a Fuzzy Approach,
By Uma Ravi Teja Macherla and Aneetha Vilventhan,
ASCE,
Journal of legal affairs and dispute resolution in construction, ASCE,
vol.17(4),
pp.04525064,
2025
Integration of Building Information Modeling, Geographic Information System, and Augmented Reality for Visualization and Management of Multiple Underground Utilities,
By R Rajadurai, Aneetha Vilventhan,
ASCE,
Journal of Pipeline Systems Engineering and Practice,
vol.16,
pp.1,
2025
Development of a project complexity measurement model for metro rail projects,
By Sruthilaya, D., Vilventhan, A. and Gopal, P.R.C. ,
Emerald,
Engineering, Construction and Architectural Management,
vol.,
pp.,
2024
Development of a building information modelling based decision-making framework for green retrofitting of existing buildings,
By Kaashi, S and Vilventhan, A. ,
Elsevier,
Journal of Building Engineering ,
vol.,
pp.,
2023
Analysis of project complexity factors and their interdependencies in metro rail projects,
By Sruthilaya, D., Vilventhan, A. and Gopal, P.R.C. ,
Emerald,
Built Environment Project and Asset Management,
vol.,
pp.,
2023
Integrating Road information modeling (RIM) and geographic information system (GIS) for effective utility relocations in infrastructure projects,
By Rajadurai, R. and Vilventhan, A. ,
Emerald,
Engineering, Construction and Architectural Management,
vol.,
pp.,
2022
4D BIM models for smart utility relocation management in urban infrastructure projects,
By Vilventhan, A., Razin, S. and Rajadurai, R.,
Emerald,
Facilities,
vol.,
pp.,
2020
Value stream mapping for identification and assessment of material waste in construction: A case study,
By Vilventhan, A., Ram V.G. and Sugumaran S ,
Sage,
Waste Management and Research,
vol.,
pp.,
2019
4D Bridge Information Modelling for management of bridge projects: a case study from India,
By Vilventhan, A. and Rajadurai, R. ,
Emerald,
Built Environment Project and Asset Management,
vol.,
pp.,
2019
Utility Relocation Management in Highway Projects,
By Vilventhan, A., and Kalidindi, S .N. ,
Emerald,
Built Environment Project and Asset Management,
vol.,
pp.,
2018
Conference(s)
Integration Building Information Modelling and Last Planner System for optimization of time in High Rise Projects using Myvan Technology
By Aneetha Vilventhan, Teppa Naveen Kumar, Ahmad Alothman,
Indian Lean Construction Conference (ILCC 2025),
2025
Identification of dispute causes and analysis of resolution mechanisms in metro rail projects using a fuzzy approach
By Uma Ravi Teja Macherla and Aneetha Vilventhan,
Legal Affairs and Dispute Resolution Workshop,
2025
Identification of Waste and Improvement of Productivity using Value Stream Mapping for Underground Metro Construction Project
By Ahmad Alothman and Aneetha Vilventhan ,
Indian Lean Construction Conference (ILCC 2024),
2024
Implementation of lean tool at Agra underground metro project site
By Suman Biswas , Mohit Karesia , Yadhnesh Udas and Vilventhan A ,
Indian Lean Construction Conference (ILCC 2023),
2023
Complexities of metro rail project –A case study of Hyderabad Metro rail
By Sruthilaya Dara, Dr. Aneetha Vilventhan ,
12 th Construction Industry Development Board Postgraduate Research Conference,
2022
Value engineering for the selection of a suitable type of foundation in metro rail projects: a case study from india
By Vilventhan, A., Rajadurai, R. and Vishwakarma, P,
10th World Construction Symposium,
2022
Mapping the project complexity of metro rail project using DEMATEL technique
By Sruthilaya Dara, Dr. Aneetha Vilventhan, Dr.Ramachandra Gopal. P ,
National Conference on Advances in Construction Materials and Management (ACMM),
2022
Identification and analysis of lean techniques in Indian metro rail
By Sruthilaya Dara and Dr. Aneetha Vilventhan ,
Indian Lean Construction Conference (ILCC 2022),
2022
Interaction Between Lean and BIM in the Construction of Highway Projects
By Aneetha Vilventhan, Rajadurai R,
Indian Lean Construction Conference (ILCC 2019),
2019
Application of 4D Bridge Information Model as a Lean Tool for Bridge Infrastructure Projects: A Case Study
By Vilventhan, A, Rajadurai R ,
26th Annual Conference of the International Group for Lean Construction,
2018
Factors influencing sustainable construction in India: Evidence from case studies
By Vilventhan A., and Sivaramakrishnan R ,
ICACMS 2017 international conference,
2017
Approval risks in transportation infrastructure projects in India
By Vilventhan, A., and Kalidindi, S.N,
Construction Research Congress International Conference ,
2012
Text Book(s)
Advances in Construction Materials and Management
By Aneetha Vilventhan, Shamsher Bahadur Singh, Venkata Santosh Kumar Delhi
(Published by: Springer),
Lecture Notes in Civil Engineering,
2022
Book Chapter(s)
Complexities in Metrorail Project- A Case Study of Hyderabad Metro Rail
By Dara, Sruthilaya, Dr. Aneetha Vilventhan in
Towards a Sustainable Construction Industry: The Role of Innovation and Digitalisation,
Springer,
Lecture notes in Civil Engineering,
2023
Integration of Building Information Modelling and Facility Management for Metro Rail Project: A Case Study
By Garg, A., Alothman, A., Vilventhan, A. in
Building Construction and Technology,
Springer,
Lecture notes in Civil Engineering,
2023
Rule Based Safety Checking in Scaffolds by Integrating Building Information Modeling (BIM) and Safety Management
By Vilventhan, A., Mohapatra, S. in
Construction Safety: Economics and Informatics Perspectives,
Springer,
Reference book,
2023
Interactions of Lean and BIM Integrated Augmented Reality in Underground Utility Relocation Projects
By Rajadurai, R., Vilventhan, A. in
Advances in Construction Materials and Management,
Springer,
Lecture notes in Civil Engineering,
2023
Identification of Challenges Influencing the Adoption of Building Information Modelling (BIM) and Facility Management for Metro Rail Projects in India.
By Alothman, A., Kudikala, S., Vilventhan, A. in
Advances in Construction Materials and Management,
Springer,
Lecture notes in Civil Engineering,
2023
Quantitative and Qualitative Benefits of BIM Implementation in Hospital Management: A Case Study Analysis.
By Mishra, A., Vilventhan, A in
Advances in Construction Materials and Management,
Springer,
Lecture notes in Civil Engineering,
2023
Mapping the Project Complexity of Metro Rail Project Using DEMATEL Technique
By Dara, S., Vilventhan, A., in
Advances in Construction Materials and Management,
Springer,
Lecture notes in Civil Engineering,
2023
Identification and analysis of lean techniques in Indian metro rail
By Sruthilaya Dara, Dr. Aneetha Vilventhan in
Sustainable Lean Construction,
Springer,
Lecture notes in Civil Engineering,
2023
4D BIM for the Management of Infrastructure Projects
By Vilventhan, A, Rajadurai R in
Handbook of Research on Emerging Technologies for Effective Project Management,
IGI Global Publishers,
Reference book,
2020
Patent(s)
PROCESS OF BIM ENABLED FM FOR METRO RAIL STATION FACILITIES (202441092051)
UNDERGROUND VISUALIZATION SYSTEM AND METHOD THEREOF (202441056979)
PROJECT / CONSULTANCY
Development of Digital Twin for Underground Utility Information management
Role:
Principal Investigator
Type: Research
Sponsor: CSIR
Project Cost (INR): 3000000
Date of Commencement: 23-09-2024
Duration: 36 Months
Status: Ongoing
Type: Research
Sponsor: CSIR
Project Cost (INR): 3000000
Date of Commencement: 23-09-2024
Duration: 36 Months
Status: Ongoing
Development of Digital Twin of underground utilities for Smart cities
Role:
Principal Investigator
Type: SPARC Project
Sponsor: SPARC
Project Cost (INR): 7100000
Date of Commencement: 01-04-2024 Date of Completion: 01-04-2026
Duration: 24 Months
Status: Completed
Type: SPARC Project
Sponsor: SPARC
Project Cost (INR): 7100000
Date of Commencement: 01-04-2024 Date of Completion: 01-04-2026
Duration: 24 Months
Status: Completed
Development of Road Information Modelling (RIM) based Coordination Method for Utility Relocations
Role:
Principal Investigator
Type: Research
Sponsor: SERB DST
Project Cost (INR): 2000000
Date of Commencement: 12-06-2017 Date of Completion: 12-06-2021
Duration: 48 Months
Status: Completed
Type: Research
Sponsor: SERB DST
Project Cost (INR): 2000000
Date of Commencement: 12-06-2017 Date of Completion: 12-06-2021
Duration: 48 Months
Status: Completed
Development of an Utility Management System for highway projects
Role:
Principal Investigator
Type: Research
Sponsor: MHRD
Project Cost (INR): 500000
Date of Commencement: 15-01-2019 Date of Completion: 15-01-2021
Duration: 24 Months
Status: Completed
Type: Research
Sponsor: MHRD
Project Cost (INR): 500000
Date of Commencement: 15-01-2019 Date of Completion: 15-01-2021
Duration: 24 Months
Status: Completed
RESEARCH FELLOWS / PhD STUDENTS
Current PhD Students
Ahmad Alothman
Area of Research:
Integration of BIM and FM for Metro rail projects
MACHERLA UMA RAVI TEJA
Area of Research:
Smart Contracts
R RAJADURAI
Area of Research:
Digital twin and Augmented Reality for Underground utility
Yellamanda S
Area of Research:
EVALUATING AND STANDARDIZING THE BIM EXECUTION PLAN (BEP) FOR LEGAL
ENFORCEABILITY AND RISK MITIGATION IN CONSTRUCTION PROJECTS
Previous PhD Students
Dara Sruthilaya
(2024)
Area of Research:
Project Complexity
CONFERENCE / WORKSHOP / SYMPOSIUM / SHORT TERM COURSE / FACULTY DEVELOPMENT PROGRAMME
Digital Twinning of Underground utilities
16-Dec-2024
→
20-Dec-2024
Event Type:
Workshop
Role: Coordinator
Funding Agency: SPARC
Role: Coordinator
Funding Agency: SPARC
Advances in Construction Materials and Management
16-Dec-2022
→
17-Dec-2022
Event Type:
Conference
Role: Organizing Secretary
Funding Agency: Funding from Sponsors
Role: Organizing Secretary
Funding Agency: Funding from Sponsors
Advancements in Concrete technology and Construction Management
22-Aug-2022
→
26-Aug-2022
Event Type:
Faculty Development Programme
Role: Coordinator
Funding Agency: Center for Continuing Education, NIT Warangal
Role: Coordinator
Funding Agency: Center for Continuing Education, NIT Warangal
AWARDS AND ACCOLADES
2017
Early Career Research Award
ADDITIONAL RESPONSIBILITIES
- Faculty Advisor : Civil Engineering Association (Continuing from August, 2024)
- Member of CoE on IoT based condition monitoring of infrastructure (Continuing from August, 2024)
- Program coordinator for MTech CTM (April, 2021 - August, 2024)
Last updated on December 19, 2025